🐴 Lovasember · simple execution contract

Restore confidence in Meta lead flow

● PARTIAL DELIVERY

Keep the working lead campaign as it is, double its daily budget, prove delivery, and explain where enquiries may be lost.

Owner: Sol High executorUpdated: 25 Sep 20265 / 6 criteria verified

Goal and finish line

End goal: the existing lead campaign delivers with twice its previous daily budget, and Matt receives an evidence-backed answer about the lead gap.

Done means: Meta readback, delivery proof, lead-path findings, the remaining monthly-report items, and practical improvement recommendations agree.

Confirmed starting point

  • Meta account is enabled with no account-level disable reason.
  • The existing lead campaign, two ad sets and their ads are active.
  • Recent spend and impressions show delivery after the payment fix.
  • The monthly Notion/Slides branch has a completion receipt. The four-deck HTML pack is hosted and visually checked, with two strict acceptance limits.

End goal system

Existing campaign

Preserve settings and active structure.

Budget ×2

Change only the campaign daily budget.

Verified delivery

Provider readback plus spend and impressions.

Usable leads

Check the actual enquiry path and evidence.

Route to the end state

Live Meta evidence

Account, campaign, ad sets, ads and daily insights.

Narrow update

Budget change with before and after receipt.

Lead-path test

Destination, CTA, form and handoff.

Report + decisions

Finish only missing report items and prioritize fixes.

Main handoff

Input

Meta account

Ground the delivery and budget decision.

Input

Prior task and report

Avoid duplicating completed work.

Output

Campaign receipt

Prove the exact applied change.

Output

Lead diagnosis

Locate any remaining loss or uncertainty.

Output

Monthly report

Complete the requested skill only where unfinished.

Output

Recommendations

Give Matt a ranked next action list.

Proof checklist

5 of 6 verified

Meta status and exact change

VERIFIED
Observable criteria
Verified API budget diff: 2,000 → 4,000 HUF/day. Account, campaign, two ad sets and 16 ads active. Ads Manager showed On, Active and Ft4,000 Daily, independently described from a screenshot. Same-day spend and impressions advanced after the change.

Lead-path diagnosis

VERIFIED
Observable criteria
All 16 ads lead to the homepage. Meta reports 189 link clicks and 147 landing views across 21–25 Sep. The rendered FAQ apply button opened no form or schedule. The separate paid booking schedule loads. Completed enquiries, accepted leads and sales remain UNKNOWN.

Monthly report and improvements

PARTIAL
Observable criteria
Monthly Notion/audio/Slides/PPTX receipt reused. Ranked fixes prepared. Four-deck pack hosted with four decks, five recordings and fresh desktop/mobile QA. Strict pack receipt remains incomplete: the overview is 424.632 seconds against a 360-second cap, and the grounded voice review requires protected access that conflicts with the unrestricted-URL instruction.

Constraints and open facts

Protect

  • Change only the daily budget on the existing active lead campaign. Preserve audiences, ads, creatives, objective, event and other settings.
  • Do not reactivate paused seasonal or sales campaigns merely because they exist.
  • Do not call a pixel event a lead or claim business results without evidence.
  • No login gate on this public board. Keep private evidence off this page.

Open facts

  • Whether any enquiry was received or accepted through the website/CRM during the payment interruption.
  • The four-deck pack is hosted and visually checked, but strict combined verification reports incomplete for the two stated contract limits.

Executor updates

Verified Meta change25 Sep 2026, 11:38 CEST

The active lead campaign budget changed once from 2,000 to 4,000 HUF/day. Provider readback shows ACTIVE. The two active ad sets and the paused sales campaign are unchanged.

Delivery and destination25 Sep 2026

Five dated days have spend and impressions. All 16 active ads link to the homepage. The FAQ apply button opened no form or schedule; the separate booking route loads but conflicts with free and 5,000 HUF wording. Meta pixel actions are not verified leads.

Report acceptance limit25 Sep 2026

The four-deck pack is live at an unrestricted URL, with five narrations and fresh visual QA. The official combined verifier remains incomplete because the overview narration exceeds its cap and the grounded voice-review requirement would add protected access. The robot remains unavailable, and no completed voice session is claimed.